Removal and installation of a forward cover of the transmission
Details of installation of a forward cover of the transmission
92 — the Forward cover of the transmission 92a — the Bolt 93 — the Epiploon 94, 96 — Laying
100 — RKPP 150 — the coupling switching off Bearing 155 — the coupling switching off Lever
Removal
PERFORMANCE ORDER
1. Fix the transmission on a support.
Installation
3. Further installation is carried out as it should be, the return to removal.