|
Mercedes S-Class W-1401991-1999 of releaseRepair and operation of the car |
|
Mercedes S-Class + Mercedes-Benz cars of the class S (W-140) + Operation manual + Routine maintenance - Engine Check of a compression in engine cylinders Check of the engine by means of the vacuum gage Belt of the streaming drive of auxiliary units + 6-cylinder petrol engines (M104.944 and M104.990/994) - 8-cylinder petrol engines (M119.970/981 and M119.971/981) Covers of heads of the block of cylinders - installation details Removal and installation of the inlet pipeline Removal and installation of a final collector Removal and installation of heads of the block of cylinders Removal and installation of covers of a chain of the GRM drive Replacement of a chain of the GRM drive Check of phases of gas distribution The GRM drive - the general information, service of components Removal and installation of the regulator of phases of gas distribution Removal and installation of camshafts Check and adjustment of control position of camshafts Removal and installation of valves Replacement of the directing plugs of valves Replacement of rings of saddles of valves Removal and installation of pistons Designation and sizes of pistons Check of a condition of rods Check of a condition of a bent shaft + 12-cylinder petrol engines (M120.980/982) + 6-cylinder diesel engines (OM603.971) + 6-cylinder diesel engines (OM606.961) + Cooling systems, heating + Power supply system and release + Engine electric equipment + Gear shifting box + Automatic transmission + Coupling + Brake system + Suspension bracket and steering + Body + Onboard electric equipment |
Removal and installation of covers of a chain of the GRM drive Removal Details of installation of a cover of a chain of the GRM drive (1 of 3), reduction of the engine in situation 45 ° before VMT of the piston of the first cylinder (shooter)
Details of installation of a cover of a chain of the GRM drive (2 of 3)
Details of installation of a cover of a chain of the GRM drive (3 of 3), shooters are shown places of putting motive oil
Installation Installation is made as it should be, the return to removal. Wipe sealing surfaces and grease them with sealant 002 989 47 20 10. Replace sealing rings (23) and (24), oil motive laying. Replace a forward epiploon of a bent shaft. |
|