2 — the Basic rack 3 — Gidrokompensator 5 — the Persistent detail 6 — Nippers
7 — the Support 8, 23 — the Bolt 9 — Press the lever 14 — Crackers 15 — the Top clamp of a spring
Establish a head of the block of cylinders (87) on the basis (24). Establish an insert (25) on the basis (24) in the direction of an arrow (26).
PERFORMANCE ORDER
1. Tighten a head of the block of cylinders (87) to the basis (24) by means of bolts of fastening of a head of the block of cylinders in front and behind in the direction of an arrow (26). 2. Establish a basic rack (2) with a support (7) in not the central situation. 3. Tighten a basic rack (2) two bolts of M7x35 (bolts of fastening of covers of bearings). 4. Remove hydrocompensators (3) from each cylinder. 5. Press attach the lever (9) with a persistent detail (5) to a support. 6. Attach a persistent detail (5) vertically to a clamp of a spring (15). 7. Fix a support (7) by a bolt (8). 8. Squeeze a spring (17). 9. Remove crackers of the valve (14). 10. Remove a spring of the valve (17) together with a clamp (15). 11. Replace an epiploon of the valve (19). 12. Remove the lower clamp of a spring (20). 13. Remove a head of the block of cylinders (87) from the basis and remove valves (21).
Installation
Installation is made as it should be, the return to removal.