Removal and installation of the lever of the selector of gear shifting
Removal
Details of installation of the lever of the selector of gear shifting (with the regime W/S switch)
39 — Laying 40 — Bolts (4 pieces) 97 — the Intermediate lever
S16/10 — the Sensor switch of position of the selector S16/10s2 — the Switch of lamps of a backing Y66/1 — the Electromagnetic drive of blocking of provisions of "R/P"
PERFORMANCE ORDER
1. Remove the switching lever from the intermediate lever (97). 2. Remove the central console. 3. Turn off bolts (40). 4. Disconnect sockets and the electromagnetic drive of blocking of provisions of "R/P" (Y66/1) from the identification switch (S16/10), the switch of lamps of a backing (S16/10s2). 5. Remove the gear shifting selector lever assembled from a floor.
Installation
Installation is carried out as it should be, the return to removal. Check for correctness of installation and a condition of laying (39), in case of need make replacement.