Mercedes S-Class W-140

1991-1999 of release

Repair and operation of the car



Mercedes S-Class
+ Mercedes-Benz cars of the class S (W-140)
+ Operation manual
+ Routine maintenance
+ Engine
+ Cooling systems, heating
+ Power supply system and release
+ Engine electric equipment
+ Gear shifting box
+ Automatic transmission
+ Coupling
+ Brake system
- Suspension bracket and steering
   Security measures
   Angles of installation of wheels of the car, clearance
   - Forward suspension bracket
      Adjustment of a gap in the bearing of a forward wheel
      Removal and installation of the lower spherical support
      Check of a condition of the top spherical support
      Replacement of the top cross lever
      Replacement of the lower cross lever
      Removal, check and installation of a nave of a forward wheel
      Removal and installation of assembly of a rotary fist
      Removal and installation of a screw spring
      Removal and installation of the stabilizer of cross stability
      Removal and installation of the shock-absorber
      The regulator of clearance of a forward suspension bracket - an installation detail
   + Back suspension bracket
   + Steering
+ Body
+ Onboard electric equipment







The regulator of clearance of a forward suspension bracket - an installation detail

Location of the regulator of clearance of a forward suspension bracket

6 — the Regulator of clearance of a forward suspension bracket
52 — the Distributor
54 — the Connecting lever
Р — the Steel pipeline

Removal

 PERFORMANCE ORDER

1. Disconnect the forcing pipeline (P). Merge oil in a suitable container.

2. Turn off bolts (shooter) and uncover (a) on the right wheel arch.
3. Remove an arm (shooter) on a side beam, - on models with M119 and M120 engines at first it is necessary to remove a heat-shielding guard.
4. Remove clamps (A) from the valve of adjustment of clearance of a forward suspension bracket (Y37) and remove it, (except the models delivered to the USA).
5. Disconnect the forcing pipeline (PV and TV) from the regulator and the distributor (52) and remove both pipelines.
6. Unscrew the connecting lever (15) from the regulator.
7. By means of a key disconnect the forcing (S1) and (S2) pipelines from the regulator.
8. Turn off bolts (52b) of fastening of the regulator (Y36) and remove it.

Installation

Installation is carried out as it should be, the return to removal.